Client • Wellington Water

Location • Te Mārua Water Treatment Plant

Duration • 12 Months

Te Mārua Control Network Upgrade

Stewart Electrical completed a plant-wide communications network upgrade at the Te Mārua Water Treatment Plant, replacing the existing ControlNet system with a modern fibre optic/ethernet ring network.

Working alongside Wellington Water's control systems team, we installed and commissioned the new communications infrastructure while maintaining reliable operation of this critical water treatment facility.

Project Deliverables

  • Fibre optic communications ring installation

  • Control network replacement

  • Communications hardware installation

  • Cable infrastructure upgrades

  • Commissioning and integration with plant control systems