Client • Wellington Water
Location • Te Mārua Water Treatment Plant
Duration • 12 Months
Te Mārua Control Network Upgrade
Stewart Electrical completed a plant-wide communications network upgrade at the Te Mārua Water Treatment Plant, replacing the existing ControlNet system with a modern fibre optic/ethernet ring network.
Working alongside Wellington Water's control systems team, we installed and commissioned the new communications infrastructure while maintaining reliable operation of this critical water treatment facility.
Project Deliverables
Fibre optic communications ring installation
Control network replacement
Communications hardware installation
Cable infrastructure upgrades
Commissioning and integration with plant control systems