Client • Wellington Water

Location • Wellington

Duration • 1 month

Kaiwharawhara Pump Station Upgrade

Stewart Electrical completed a full electrical upgrade of the Kaiwharawhara Pump Station, replacing ageing infrastructure with modern control equipment to improve reliability and operational performance.

The project required careful planning to minimise downtime while replacing major electrical equipment.

Project Deliverables

  • New MCC switchboard

  • New control panel

  • Installation of ABB Variable Speed Drives

  • Removal and replacement of existing switchboard

  • Building ventilation upgrades

  • New pressure transmitters

  • Testing and commissioning