Client • Wellington Water

Locations • Porirua Wastewater Treatment Plant

Duration • 6 months

Porirua UV Backup Generator

Stewart Electrical was appointed as the principal contractor for the installation of a new backup generator system, providing reliable standby power for the Porirua UV Treatment Plant.

Our team managed the project from electrical design and installation through to SCADA integration, commissioning and contractor coordination.

Project Highlights

  • Principal contractor responsibilities

  • Backup generator installation

  • Automatic transfer switchboard

  • Cable and ducting installation

  • SCADA integration

  • Generator commissioning

  • Health & Safety management

  • Project coordination and documentation