Client • Brian Perry Civil on behalf of Wellington Water

Locations • Porirua Wastewater Treatment Plant, Titahi Bay

Porirua Step Screen Plant

Stewart Electrical completed the electrical installation for a new bypass step screen system at the Porirua Wastewater Treatment Plant.

The project included installing control equipment, site wiring and electrical services for the new screening and wash press system.

Project Highlights

  • New control panel installation

  • Site electrical wiring

  • Step screen installation

  • Wash press integration

  • Local control systems

  • Testing and commissioning

Previous
Previous

Te Mārua Cross Connection Valve Chamber Upgrade

Next
Next

Porirua UV Backup Generator